Home Page | Members Only | Publications | Search | Uploads | Show Control Panel   Refresh   Help  
 
 
 Home > PSERC Only > IAB Meetings > IAB 2003 Meeting: Dec. 10-12, Scottsdale, AZ > Logistics
Logistical Information
Log-in is required. Click on Show Control Panel above to log-in. Afterwards, click on "Hide Control Panel" to close the control panel.

    No FOLDERS found.

  Sort by:   Number   Name Author Date Size Type
Fault Current Issues for Market Driven Power Systems with Distributed Generation
This paper presents the consequences and operating limitations of installing distributed generation (DG) to electric power systems. The proliferation of new generators creates new operating conditions, some not seen before, that are limited by fault interruption capability. Increased system fault currents resulting from DG installation and the effects of increased fault currents are discussed. A technique used to evaluate fault current in the system after installing DGs is analyzed, and an example is given. The responsibility for the system change and safety degradation is discussed.
N. Nimpitiwan, G. Heydt4/19/2004125.8kPDF
Meeting and Registration Information
No log-in required to view this file.
11/7/2003LinkURL
Final Agenda
12/6/200345.6kPDF

  Show Control Panel   Refresh   Help  
Last Modified: 16:35:08 4/19/2004