Home Page | Members Only | Publications | Search | Uploads | Show Control Panel   Refresh   Help  
 
 
 Home > PSERC Only > IAB Meetings > IAB 2002 Meeting: May 30-31, Schenectady, NY > Posters
Log-in is required. Click on Show Control Panel above to log-in. Afterwards, click on "Hide Control Panel" to close the control panel.

    No FOLDERS found.

  Sort by:   Number   Name Author Date Size Type
Power System State Estimation and Optimal Measurement Placement for Distributed Multi-Utility Operation
Ali Abur and Garng Huang5/23/2002215kPPT
Enhanced State Estimation by Advanced Substation Monitoring
Poster Presentation for the IAB Meeting, May 2002
Ali Abur and M. Kezunovic5/20/2002641.5kPPT
Coordination of Transmission Line Transfer Capablitity
Mani Venkatasubramanian5/24/200293kPPT
Poster: Contribution Allocation for Voltage Stability Assessment In Deregulated Power Systems
Dr. G. Huang, K. Men, N.Nair5/25/2002267.5kPPT
Poster: Accurate Fault Location in Transmission and Distribution Networks
Dr. M. Kezunovic5/25/2002247.5kPPT
IAB May 02 Poster - Non Ceramic Insulators
Poster for the May 02 IAB meeting on a project on testing nonceramic insulators.
R. Gorur5/22/2002839.5kPPT
Poster: Power System monitoring Using Wireless Substation and System-wide Communications
Note: The poster is very big (10MB), and it may take a while to load
Dr. M. Kezunovic5/25/2002LinkURL
Poster: GUI for overhead transmission line sag
Poster summarizes project progress
Heydt5/18/2002189.5kPPT
Integrated Security Analysis
Kevin Tomsovic5/29/2002586.5kPPT
Corona Discharge Deterioration of ADSS Cable
George Karady5/21/2002693.5kPPT
Electrical Transmission Line Insulator Flashover Predictor
George Karady5/21/2002107kPPT
Investigation of Fuel Cell Operation and Interaction within the Surrounding Network
George Karady5/21/200286.5kPPT
Evaluation of Distributed Energy Generation and Storage
Dr. Ward Jewell6/13/20021.2MPPT
Personnel Grounding and Safety Issues / Solutions Related to Servicing Telecommunications Equipment Connected to Fiber Optic Cables in Optical Ground Wire (OPGW)
Robert G. Olsen5/21/20026.8MPPT
A New Scheme for Voltage Control in a Competitive Ancillary Service Market
Emilia Nobile and Anjan Bose5/27/2002779kPPT
Extended State Estimation for Synchronous Generator Parameters
E. Kyriakides, G. T. Heydt8/7/2002711.5kPPT
A METHOD FOR CLASSIFYING AGENT OFFER STRATEGIES IN AN ELECTRICITY POWER MARKET
HyungSeon Oh, Robert J. Thomas, Bernie Lesieutre, Peter Wong6/5/20022.0MPPT
MicroGrid Protection and Control (T-18)
Bob Lasseter5/27/2003570.5kPPT
Security enhancement through direct non-disruptive load control
Vijay Vittal and Ian Hiskens5/23/2003144.2kPDF
Electric Power Quality Research
A. P. Meliopoulos, E. Glytsis, M. Kezunovic5/29/2002393kPPT
Comprehensive Power System Reliability Assessment
A. P. Meliopoulos, D. Taylor and M. Kezunovic5/29/2002885.5kPPT
Market Power Project
Gerry Sheble6/1/2002140kPPT
Risk-based Maintenance Allocation and Scheduling for Bulk Transmission System Equipment
Poster slides for May 2002 IAB meeting.
Jim McCalley, Tim Van Voorhis, Sakis Meliopoulos5/28/20021.5MPPT
NOMOGRAMS FOR SIMULTANEOUS TRANSFER CAPABILITY
Mancilla-David and Alvarado5/29/2002430.5kPPT
GUI for synchronous machine parameter estimation
Graphic user interface for a synchronous machine paramter estimator
G. Heydt5/18/2002673kPPT
Bidding Agents
Sarosh Talukdar5/25/200240kPPT
02-13bVoltage Constraints and Power Nomograms
This work establishes that nodal prices depend on what constraints and limits are assumed for the operating point, and that the common practice of using nomograms where a flow limits is used in lieu of a voltage limit can result in prices that greatly depart from the correct nodal prices. Starting generators in order to meet reactive and voltage constraints can result in a significant “uplift” cost. If we replace voltage limits with flow limits, we get the same solution but the prices (i.e., the incentives) are different. Thus, the use of nomograms and other forms of surrogate limits yields the right solution but for the wrong reason and can lead to incorrect incentives.
Presented at the May 2002 PSERC Industry Advisory Board Meeting. Uploaded: May 2002.
Luis Julian Zuluaga and Fernando L. Alvarado9/26/2005219.5kPPT

  Show Control Panel   Refresh   Help  
Last Modified: 15:40:13 9/26/2005