|
|
Sort by:
Number
Name
|
Author
|
Date
|
Size
|
Type
|
| Power System State Estimation and Optimal Measurement Placement for Distributed Multi-Utility Operation
| Ali Abur and Garng Huang | 5/23/2002 | 215k | PPT |
| Enhanced State Estimation by Advanced Substation Monitoring Poster Presentation for the IAB Meeting, May 2002 | Ali Abur and M. Kezunovic | 5/20/2002 | 641.5k | PPT |
| Coordination of Transmission Line Transfer Capablitity
| Mani Venkatasubramanian | 5/24/2002 | 93k | PPT |
| Poster: Contribution Allocation for Voltage Stability Assessment In Deregulated Power Systems
| Dr. G. Huang, K. Men, N.Nair | 5/25/2002 | 267.5k | PPT |
| Poster: Accurate Fault Location in Transmission and Distribution Networks
| Dr. M. Kezunovic | 5/25/2002 | 247.5k | PPT |
| IAB May 02 Poster - Non Ceramic Insulators Poster for the May 02 IAB meeting on a project on testing nonceramic insulators. | R. Gorur | 5/22/2002 | 839.5k | PPT |
| Poster: Power System monitoring Using Wireless Substation and System-wide Communications Note: The poster is very big (10MB), and it may take a while to load | Dr. M. Kezunovic | 5/25/2002 | Link | URL |
| Poster: GUI for overhead transmission line sag Poster summarizes project progress | Heydt | 5/18/2002 | 189.5k | PPT |
| Integrated Security Analysis
| Kevin Tomsovic | 5/29/2002 | 586.5k | PPT |
| Corona Discharge Deterioration of ADSS Cable
| George Karady | 5/21/2002 | 693.5k | PPT |
| Electrical Transmission Line Insulator Flashover Predictor
| George Karady | 5/21/2002 | 107k | PPT |
| Investigation of Fuel Cell Operation and Interaction within the Surrounding Network
| George Karady | 5/21/2002 | 86.5k | PPT |
| Evaluation of Distributed Energy Generation and Storage
| Dr. Ward Jewell | 6/13/2002 | 1.2M | PPT |
| Personnel Grounding and Safety Issues / Solutions Related to Servicing Telecommunications Equipment Connected to Fiber Optic Cables in Optical Ground Wire (OPGW)
| Robert G. Olsen | 5/21/2002 | 6.8M | PPT |
| A New Scheme for Voltage Control in a Competitive Ancillary Service Market
| Emilia Nobile and Anjan Bose | 5/27/2002 | 779k | PPT |
| Extended State Estimation for Synchronous Generator Parameters
| E. Kyriakides, G. T. Heydt | 8/7/2002 | 711.5k | PPT |
| A METHOD FOR CLASSIFYING AGENT OFFER STRATEGIES IN AN ELECTRICITY POWER MARKET
| HyungSeon Oh, Robert J. Thomas, Bernie Lesieutre, Peter Wong | 6/5/2002 | 2.0M | PPT |
| MicroGrid Protection and Control (T-18)
| Bob Lasseter | 5/27/2003 | 570.5k | PPT |
| Security enhancement through direct non-disruptive load control
| Vijay Vittal and Ian Hiskens | 5/23/2003 | 144.2k | PDF |
| Electric Power Quality Research
| A. P. Meliopoulos, E. Glytsis, M. Kezunovic | 5/29/2002 | 393k | PPT |
| Comprehensive Power System Reliability Assessment
| A. P. Meliopoulos, D. Taylor and M. Kezunovic | 5/29/2002 | 885.5k | PPT |
| Market Power Project
| Gerry Sheble | 6/1/2002 | 140k | PPT |
| Risk-based Maintenance Allocation and Scheduling for Bulk Transmission System Equipment Poster slides for May 2002 IAB meeting. | Jim McCalley, Tim Van Voorhis, Sakis Meliopoulos | 5/28/2002 | 1.5M | PPT |
| NOMOGRAMS FOR SIMULTANEOUS TRANSFER CAPABILITY
| Mancilla-David and Alvarado | 5/29/2002 | 430.5k | PPT |
| GUI for synchronous machine parameter estimation Graphic user interface for a synchronous machine paramter estimator | G. Heydt | 5/18/2002 | 673k | PPT |
| Bidding Agents
| Sarosh Talukdar | 5/25/2002 | 40k | PPT |
| 02-13b | Voltage Constraints and Power Nomograms This work establishes that nodal prices depend on what constraints and limits are assumed for the operating point, and that the common practice of using nomograms where a flow limits is used in lieu of a voltage limit can result in prices that greatly depart from the correct nodal prices. Starting generators in order to meet reactive and voltage constraints can result in a significant “uplift” cost. If we replace voltage limits with flow limits, we get the same solution but the prices (i.e., the incentives) are different. Thus, the use of nomograms and other forms of surrogate limits yields the right solution but for the wrong reason and can lead to incorrect incentives. Presented at the May 2002 PSERC Industry Advisory Board Meeting. Uploaded: May 2002. | Luis Julian Zuluaga and Fernando L. Alvarado | 9/26/2005 | 219.5k | PPT |